Labor cost#

For: Manager | Admin You’ll need: Permission to view reports (your manager will know).

The labor cost report rolls up total hours, total cost, and average cost per hour for each location over a date range. Use it to track spend without leaving the schedule data.

Open the report#

  1. In the left sidebar, click ‘Reports’.

  2. On the Reports landing page, click the ‘Labor cost’ card.

Filter the data#

  1. In the ‘Start date’ and ‘End date’ fields, set the date range.

  2. (Optional) Open the ‘Location’ dropdown and pick one or more locations.

  3. Click ‘Apply filters’.

To start over, click ‘Clear’.

Export#

See Export a report (CSV, XLSX, PDF) for CSV, XLSX, and PDF details.

Each row is one location, with totals for hours, cost, and average cost per hour over the selected range.

Verify it worked#

The locations on the page match the ones in your ‘Location’ filter (or all of them if the filter is empty). For each row, average cost per hour equals total cost divided by total hours.